Heat Pump Installer
Air source and ground source heat pump design, installation and commissioning.
Open the heat pump installer package
Regulations & compliance
| Regulator | Health and Safety Executive |
|---|---|
| HSAWA 1974 | Health and Safety at Work etc Act 1974 |
| MHSWR 1999 | Management of Health and Safety at Work Regulations 1999 |
| CDM 2015 | Construction (Design and Management) Regulations 2015 |
| RIDDOR 2013 | Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013 |
| Regulator | Department for Energy Security and Net Zero |
|---|---|
| MCS 023 | MCS Installer Standard |
| MCS 024 | MCS Installer Certification Requirements |
| MCS 025 | MCS Installation Standard |
| BS EN 14511 | Heat pumps performance |
| BS EN 50549 | Requirements for generating plants to be connected in parallel with distribution networks |
| MIS 3002:2025 | MCS Solar Photovoltaic Installation Standard |
| Regulator | British Standards Institution plus Competent Person Schemes |
|---|---|
| BS 7671:2018 + A4:2026 | Requirements for Electrical Installations (IET Wiring Regulations 18th Edition) |
| ESS PRS 2020 | Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 |
| Regulator | HM Revenue and Customs |
|---|---|
| TMA 1970 | Taxes Management Act 1970 |
| MTD ITSA | Making Tax Digital for Income Tax Self Assessment |
| Regulator | Health and Safety Authority |
|---|---|
| SHWWA 2005 | Safety, Health and Welfare at Work Act 2005 |
| SI 291 of 2013 | Construction Regulations 2013 (Irish equivalent of UK CDM 2015) |
| SI 299 of 2007 | Safety, Health and Welfare at Work (General Application) Regulations 2007 |
| Regulator | Department of Environment, Climate and Communications |
|---|---|
| Better Energy Homes Scheme | Solar, heat pumps, insulation grants - amounts increased Feb 2026 |
| Solar Electric Grant Scheme | |
| Heat Pump Grant | Up to EUR 12500 fixed in some cases |
| National Home Energy Upgrade Scheme | |
| Triple E Register | Energy efficient products list |
| Regulator | The Revenue Commissioners of Ireland |
|---|---|
| Form 11 | Self-employed annual return |
| Pay and File | Annual deadline 31 October (extended ~15 November for ROS filers) |
| Preliminary Tax | Pay current year tax in advance based on prior year |
| RCT | Relevant Contracts Tax — construction principal contractor tax withholding (0/20/35% rates) |
Qualifications
- MCS heat pump installer certification
- BPEC heat pump qualification
- F-Gas Category I certification
Scheme bodies
- MCS
- HIES
- TrustMark
Insurance
- Public liability insurance
- Professional indemnity insurance
- Tools cover
- Van insurance
Your package
Simplogic for gas & electrical is the heat pump installer package. Your certificates — CP12, EICR, EIC, minor works — filled in on the phone at the job, with the invoice coming off the back of the same visit. It works in a boiler cupboard with no signal, and every job you write up is kept and dated and yours.
Checked against the cited legislation on . Regulations change — follow the links above before you rely on any of this.